Skip to main content

Jerusalem

Dar al-Aytam al-Islamiya :Restoration of Academic and Industrial School

Dar al-Aytam al-Islamiya (Industrial & Academic School) The comprehensive restoration of the 600-year-old Mamluk and Ottoman complex was undertaken in six phases beginning in 1999; it was completed in 2004. The $3.5 million project, financed by private donations raised during the Sharja festival in 1998, and by grants from the Islamic Development Bank and from Welfare’s own resources. Project implementation was based on the results of extensive technical surveys, a historic analysis study and needs assessment study.

Austrian clinic

Adaptive Reuse: The aim of conservation should be the daily utilization of historic buildings since this integrates the structures into the community and is one of the best methods to protect it against physical damage. Some creative solutions have been found for adaptive reuse of neglected buildings by restoring the structure to use through providing modern facilities while protecting the historic and architectural features.

Coptic Youth Club

The Club is situated in a building owned by St. Antony’s Monastery in the Old City of Jerusalem, next to the Church of the Holy Sepulcher; this location makes it an invaluable part of the urban structure of Jerusalem. The club will be used for sports, cul

Spafford Children Centre

The Centre was established 80 years ago by an American resident, Bertha Spafford Vester, as a charitable institution to improve the health of Jerusalem’s children. The Centre occupies a complex of attached buildings inside a northern section of the walled

Arab Society for the Blind

Located in the centre of the Old City, the buildings in this exceptional complex date from the Ottoman period. Originally built as a residence and used as a school during Jordanian rule, the Arab Blind Association rented the complex in 1954 to serve the blind in Jerusalem. The three levels of buildings surrounding beautiful gardens are used as workshops for the blind, offices and services. The restoration project included introducing new infrastructure, tiling the courtyards and adapting some of the buildings to accommodate the special needs of the blind.